Innovation in Stormwater Management

  • stormwater bmp
    StormTunnel is the latest innovation in stormwater management utilizing state-of-the-art tunneling technology

ABOUT

Climate change is mandating the large-scale capture and conservation of urban stormwater runoff using Best Management Practices (BMPs).  Construction of conventional Detention-Infiltration Galleries requires large plots of open land, which are hard to find in urban settings.  The extensive open excavation and massive earth moving activities for these facilities causes significant disruption, while their construction and operation has a huge carbon footprint.  Drywells have no detention capability and provide limited infiltration capacity requiring clusters of adequately spaced units connected with surface excavated piping, limiting their practicality and causing significant impact during construction.  Both BMPs typically require pumping at diversion. 

StormTunnel - Stormwater Capture Technology

StormTunnel combines the storage capacity of bored tunnels with infiltration capability of drywells to deliver an entirely new Detention-Infiltration-Retention BMP with no land constraints.  It capitalizes on recent advances and innovations in tunneling, which have made it a viable alternative for urban infrastructure. StormTunnel is bored under public streets and parks, below existing utilities,  where land availability is no issue. The tunneling eliminates the public impact of surface construction and minimizes the earthwork.  StormTunnel does not need diversion pumping since it is below the storm drain and can eliminate the need for pretreatment by providing internal retention space for sediment deposition before water reaches the infiltration drywell inlets, which are equipped with filter fabric that protect the drywells from any remaining suspended solids.

StormTunnel is the only truly universal solution capable of meeting the enormous challenges of sustainable urban stormwater management that our congested cities need today.

TECHNOLOGY

  • Standardized 12-ft ID bored tunnel with concrete liner
  • Full gravity solution with no pump station required for diversion
  • Practically unlimited Detention volume and Infiltration capacity
  • Option of perforated tunnel and/or drywells for Infiltration
  • Option of drywell risers and/or partitions for Retention
  • 100% versatile division of BMP volume between Detention and Retention

COMPARISON

Please see our proposed Projects for a comparison between conventional Detention/Infiltration BMPs and StormTunnel.

 

SERVICES

SEITec provides turn key services for your StormTunnel BMP, which includes Planning and BMP Sizing, Environmental Review, Engineering Design, Permitting, and Construction (through affiliate tunneling company).

 

CONTACT US


     

    StormTunnel is a SEITec Innovative Technology

    SEITec
    25500 Hawthorne Blvd., Suite 1170
    Torrance, CA 90505
    (310) 375-0342
    info@seitecinc.com